GENERAL HOSPITAL NO. 10 EXPANSION

GENERAL HOSPITAL NO. 10 EXPANSION

The Hospital No. 10 Expansion Project is a large-scale healthcare project developed to expand healthcare capacity and provide additional specialized clinical areas. Dong SaPa was responsible for the supply and installation of air-conditioning, ventilation, and clean-air systems within the contracted scope of work.

The systems were implemented to meet the environmental requirements of healthcare facilities, ensure reliable operation, and comply with applicable technical standards. The works were carried out in a coordinated manner, with close attention to construction quality, safety, and schedule requirements throughout the hospital expansion.

TECHNICAL SOLUTIONS
DONG SAPA

HVAC Solutions for Healthcare Facilities: Integrated air-conditioning and ventilation systems designed to meet healthcare environmental requirements, ensuring comfort and stable conditions across functional areas.

DONG SAPA

Clean-Air Solutions: Clean-air systems designed for operating rooms and other specialized areas, maintaining appropriate indoor air conditions for their specific functions.

DONG SAPA

Optimized System Operation: Coordinated design and installation of air-conditioning, ventilation, and supporting infrastructure to improve operational efficiency, energy performance, and ease of maintenance.

DONG SAPA

Safe Execution & On-Time Delivery: All HVAC works are carried out in accordance with technical procedures and project schedules, with strict compliance with occupational safety, environmental, and fire safety requirements.

Project Type
Hospital
Scope of Work
Replacement, Installation, Testing, Commissioning & Handover of the Air-Conditioning System
System Capacity
600 HP
Project Status
UNDER CONSTRUCTION
Project Gallery
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
PROJECT LOCATION
DONG SAPA
Project location

No. 10, National Highway 1A, Thanh Xuan Commune, Can Tho City

DONG SAPA
Region

Southwestern Vietnam

DONG SAPA
Distance to technical station

12 km

DONG SAPA
Technical response time

Within 24 hours

Other projects
HOAN MY DONG NAI HOSPITAL
Project Type: Hospital
Scope of Work: Replacement, Installation, Testing, Commissioning & Handover of the Samsung VRF Air-Conditioning System
System Capacity: 120 HP
HUE INTERNATIONAL GENERAL HOSPITAL
Project Type: Hospital
Scope of Work: Daikin VRV A central air conditioning system
System Capacity: 1124 HP
MAIKABEAUTY CO., LTD.
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of Daikin VRV IV S central air-conditioning and auxiliary ventilation systems
System Capacity: 70 HP
AN PHUOC GENERAL HOSPITAL
Project Type: Hospital
Scope of Work: Supply and Installation of Daikin VRV A Air-Conditioning System
System Capacity: 90 HP
MAILISA BEAUTY CLINIC – NHA TRANG
Project Type: Hospital & Spa
Scope of Work: Supply and Installation of Daikin Inverter Air-Conditioning & Ventilation Systems
System Capacity: 35 HP
MAILISA BEAUTY CLINIC – VINH
Project Type: Hospital & Spa
Scope of Work: Supply and Installation of Daikin Inverter Air-Conditioning & Ventilation Systems
System Capacity: 80 HP