LS PACK Cu Chi Factory is an industrial manufacturing facility that requires reliable air-conditioning system operation. Dong SaPa supplied and installed the air-conditioning systems for different areas of the factory, covering equipment supply, installation, system completion, and handover.

The solution was designed to meet the cooling requirements of each area while maintaining a stable working environment and supporting reliable, long-term system operation.

TECHNICAL SOLUTIONS
DONG SAPA

Air Conditioning for Different Areas: A combination of central air conditioning, ceiling-mounted units, and Packaged systems is used to meet the cooling requirements of different spaces within the factory.

DONG SAPA

Cooling for Factory Office Areas: Cooling capacity is distributed according to the requirements of each area, providing stable temperatures and a comfortable working environment.

DONG SAPA

Equipment & Control Integration: Air-conditioning equipment is supplied together with compatible control accessories and connections to support stable and convenient system operation.

Project Type
Industrial Plant
Scope of Work
Supply and installation of Daikin Packaged and Trane Split air-conditioning systems
System Capacity
155 HP
Project Status
COMPLETED
Project Gallery
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
PROJECT LOCATION
DONG SAPA
Project location

Tay Bac Cu Chi Industrial Park, Tan An Hoi, Ho Chi Minh City, Vietnam, covering three locations: Lots A2-2, B1-5 and C2-3

DONG SAPA
Region

Southeastern Vietnam

DONG SAPA
Distance to technical station

30 km

DONG SAPA
Technical response time

Within 24 hours

Other projects
YAZAKI EDS VIETNAM FACTORY
Project Type: Industrial Plant
Scope of Work: Packaged Air-Conditioning System
System Capacity: 1220 HP
YUWA VIETNAM FACTORY 2
Project Type: Industrial Plant
Scope of Work: Supply of air-conditioning systems and accessories for the second and third floors
System Capacity: 283 HP
VINA COSMO FACTORY 3
Project Type: Industrial Plant
Scope of Work: Supply and installation of Daikin VRV 6 central air-conditioning system
System Capacity: 330 HP
POMINA 2 STEEL FACTORY
Project Type: Industrial Plant
Scope of Work: Supply and installation of Daikin Packaged air-conditioning systems for electrical cabinet rooms
System Capacity: 580 HP