ĐÔNG SAPA

HONG DUC II GENERAL HOSPITAL

HONG DUC II GENERAL HOSPITAL

Hong Duc II General Hospital comprises a range of specialized functional areas, each with distinct requirements for air conditioning, ventilation, and air treatment. Patient wards, corridors, and operating rooms in particular require HVAC solutions tailored to their specific operating conditions.

For this project, Dong SaPa delivered a broad scope of HVAC works, covering air conditioning for patient wards, ventilation, corridor smoke extraction, pressurization, and air treatment for operating rooms. The scope also included ductwork, refrigerant piping, condensate drainage, control systems, and associated infrastructure, providing a complete HVAC solution to support the hospital’s day-to-day operation.

TECHNICAL SOLUTIONS
ĐÔNG SAPA

Zoned Air Conditioning: Air-conditioning equipment was configured to suit the functional and operating requirements of different areas throughout the hospital.

ĐÔNG SAPA

Smoke Extraction & Pressurization: Corridor smoke extraction and stairwell and elevator-shaft pressurization systems were installed to support the building’s fire-safety requirements.

ĐÔNG SAPA

Operating Room Air Treatment: AHUs with high-efficiency filtration provide controlled air treatment for operating-room areas.

ĐÔNG SAPA

HVAC Controls & Infrastructure: Control systems, ductwork, piping, and associated infrastructure were completed to support reliable system operation.

Project Type
Hospital
Scope of Work
Supply and Installation of Air-Conditioning, Ventilation, Pressurization & Operating Room Clean-Air Systems
System Capacity
710 HP
Project Status
COMPLETED
Project Gallery
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
PROJECT LOCATION
ĐÔNG SAPA
Project location

259 An Phu Dong 3 Street, An Phu Dong Ward, Ho Chi Minh City, Vietnam

ĐÔNG SAPA
Region

Southeast Vietnam

ĐÔNG SAPA
Distance to technical station

10 km

ĐÔNG SAPA
Technical response time

Within 24 hours

Other projects
GENERAL HOSPITAL NO. 10 EXPANSION
Project Type: Hospital
Scope of Work: Replacement, Installation, Testing, Commissioning & Handover of the Air-Conditioning System
System Capacity: 600 HP
HOAN MY DONG NAI HOSPITAL
Project Type: Hospital
Scope of Work: Replacement, Installation, Testing, Commissioning & Handover of the Samsung VRF Air-Conditioning System
System Capacity: 120 HP
HUE INTERNATIONAL GENERAL HOSPITAL
Project Type: Hospital
Scope of Work: Daikin VRV A central air conditioning system
System Capacity: 1124 HP
MAIKABEAUTY CO., LTD.
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of Daikin VRV IV S central air-conditioning and auxiliary ventilation systems
System Capacity: 70 HP
AN PHUOC GENERAL HOSPITAL
Project Type: Hospital
Scope of Work: Supply and Installation of Daikin VRV A Air-Conditioning System
System Capacity: 90 HP
MAILISA BEAUTY CLINIC – NHA TRANG
Project Type: Hospital & Spa
Scope of Work: Supply and Installation of Daikin Inverter Air-Conditioning & Ventilation Systems
System Capacity: 35 HP