Dong SaPa carried out the renovation and replacement of the central cooling system for a high-rise building in Vinhomes Central Park, Binh Thanh. With high occupancy levels and strict requirements for quiet operation, the project required a carefully planned air-cooled chiller solution to maintain stable chilled-water flow and consistent cooling performance throughout the system.

The work covered high-pressure galvanized steel piping, dedicated electrical protection, and the safe dismantling and crane lifting of equipment to the rooftop during nighttime construction. Each stage was carefully coordinated to meet the building management’s technical and operational requirements while minimizing disruption to ongoing building activities.

TECHNICAL SOLUTIONS
ĐÔNG SAPA

Air-Cooled Chiller System: New-generation air-cooled chillers are configured to provide stable and efficient cooling for the building.

ĐÔNG SAPA

Chilled-Water Piping & Control: Shut-off valves, balancing valves, and pressure gauges are installed to support accurate chilled-water flow adjustment.

ĐÔNG SAPA

Electrical Protection: Dedicated electrical panels with circuit breakers provide overload protection and support reliable system operation.

Project Type
High-Rise Office Building
Scope of Work
Turnkey replacement of the Daikin air-cooled chiller system for the high-rise building
System Capacity
200 HP
Project Status
COMPLETED
Project Gallery
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
ĐÔNG SAPA
PROJECT LOCATION
ĐÔNG SAPA
Project location

Tan Cang, Vinhomes Tan Cang, Thanh My Tay, Ho Chi Minh City, Vietnam

ĐÔNG SAPA
Region

Southeastern Vietnam

ĐÔNG SAPA
Distance to technical station

5 km

ĐÔNG SAPA
Technical response time

Within 24 hours

Other projects
PTSC MECHANICAL AND CONSTRUCTION OFFICE RENOVATION – VUNG TAU
Project Type: Office
Scope of Work: Supply, Replacement & Reconnection of Daikin VRV Outdoor Units
System Capacity: 182 HP
BIDV BANK
Project Type: High-Rise Office Building
Scope of Work: Supply & Installation of Daikin VRV-4S and SkyAir Systems
System Capacity: 13 HP
CLUB HOUSE
Project Type: Club House – Service Building
Scope of Work: Daikin VRV A Central Air-Conditioning System
System Capacity: 123 HP
REUNIFICATION HALL
Project Type: Administrative & Conference Center
Scope of Work: Integrated upgrade of the two-chiller system and electrical control panel.
System Capacity: 344 HP
KY NGUYEN SCHOOL – DISTRICT 9
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of Daikin VRV S and SkyAir air-conditioning systems
System Capacity: 40 HP
NAM A BANK – CAN THO BRANCH
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of the Daikin VRV A central air-conditioning system
System Capacity: 401 HP