NAM A BANK – HEAD OFFICE – 8TH FLOOR RENOVATION

NAM A BANK - HEAD OFFICE – 8TH FLOOR RENOVATION

The HVAC renovation project on the 8th floor of Nam A Bank’s Head Office in District 3, Ho Chi Minh City, focused on optimizing the office environment while supporting long-term energy-efficient operation.

The solution combines an inverter central air-conditioning system with concealed ducted indoor units, providing even and quiet air distribution throughout the workspace. A heat recovery unit supports fresh-air ventilation, while independent temperature zoning allows different functional areas to be controlled according to their specific requirements. The project also included the replacement of existing diffusers with linear diffusers, with installation carefully coordinated to meet the building management’s nighttime construction schedule.

TECHNICAL SOLUTIONS
DONG SAPA

Inverter Air-Conditioning System: Inverter outdoor units are installed on sturdy steel support frames with rubber anti-vibration pads to minimize vibration during operation

DONG SAPA

Concealed Ducted Indoor Units: Concealed ducted units are combined with sheet-metal sound attenuator boxes to support quiet operation in the workspace.

DONG SAPA

Air Distribution System: Insulated ductwork is combined with straight and curved linear diffusers for even air distribution and seamless integration with the ceiling design.

DONG SAPA

Control System Support: A dedicated communication signal amplifier is installed to support system connectivity and control.

Project Type
High-Rise Office Building
Scope of Work
Supply and installation of the Daikin VRV A central air-conditioning system with concealed ducted indoor units
System Capacity
25 HP
Project Status
COMPLETED
Project Gallery
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
PROJECT LOCATION
DONG SAPA
Project location

201–203 Cach Mang Thang Tam Street, Ban Co, Ho Chi Minh City, Vietnam

DONG SAPA
Region

Southwest Vietnam

DONG SAPA
Distance to technical station

1.2 km

DONG SAPA
Technical response time

Within 24 hours

Other projects
CLUB HOUSE
Project Type: Club House – Service Building
Scope of Work: Daikin VRV A Central Air-Conditioning System
System Capacity: 123 HP
REUNIFICATION HALL
Project Type: Administrative & Conference Center
Scope of Work: Integrated upgrade of the two-chiller system and electrical control panel.
System Capacity: 344 HP
KY NGUYEN SCHOOL – DISTRICT 9
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of Daikin VRV S and SkyAir air-conditioning systems
System Capacity: 40 HP
NAM A BANK – CAN THO BRANCH
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of the Daikin VRV A central air-conditioning system
System Capacity: 401 HP
MAI OFFICE
Project Type: High-Rise Office Building
Scope of Work: Turnkey installation of Daikin Multi, SkyAir concealed ducted, Room Air, and ventilation systems
System Capacity: 40 HP
HUAWEI – IT ROOM
Project Type: High-Rise Office Building
Scope of Work: Turnkey installation of Daikin VRV IV S and SkyAir Inverter air-conditioning systems
System Capacity: 10 HP
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.