DONG SAPA

PHARMACITY NEW OFFICE

PHARMACITY NEW OFFICE

The PharmaCity office features a modern, flexible open-plan workspace. To meet the requirements for zoned temperature control and indoor air quality, Dong SaPa implemented an integrated air-conditioning and ventilation solution.

The system combines a VRV air-conditioning system with multi-directional cassette and concealed ducted indoor units to provide even and quiet air distribution. A galvanized steel ductwork system supports continuous fresh-air supply and exhaust ventilation, helping maintain a comfortable and well-ventilated working environment for employees.

TECHNICAL SOLUTIONS
DONG SAPA

VRV Air-Conditioning System: The VRV system combines multi-directional cassette and concealed ducted indoor units to provide effective cooling and even air distribution throughout the workspace.

DONG SAPA

Ventilation System: Galvanized steel ductwork is installed for coordinated fresh-air supply and exhaust, combined with dedicated exhaust fans to support effective air circulation.

DONG SAPA

HVAC Supporting Materials: Copper refrigerant piping, elastomeric rubber insulation, and uPVC condensate drainage piping are installed together with the safe removal and modification of the existing system.

Project Type
High-Rise Office Building
Scope of Work
Daikin VRV A air-conditioning and ventilation systems
System Capacity
111 HP
Project Status
COMPLETED
Project Gallery
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
DONG SAPA
PROJECT LOCATION
DONG SAPA
Project location

109 Binh Trung Tay, Binh Trung, Ho Chi Minh City, Vietnam

DONG SAPA
Region

Southwest Vietnam

DONG SAPA
Distance to technical station

10 km

DONG SAPA
Technical response time

Within 24 hours

Other projects
CLUB HOUSE
Project Type: Club House – Service Building
Scope of Work: Daikin VRV A Central Air-Conditioning System
System Capacity: 123 HP
REUNIFICATION HALL
Project Type: Administrative & Conference Center
Scope of Work: Integrated upgrade of the two-chiller system and electrical control panel.
System Capacity: 344 HP
KY NGUYEN SCHOOL – DISTRICT 9
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of Daikin VRV S and SkyAir air-conditioning systems
System Capacity: 40 HP
NAM A BANK – CAN THO BRANCH
Project Type: High-Rise Office Building
Scope of Work: Turnkey supply and installation of the Daikin VRV A central air-conditioning system
System Capacity: 401 HP
MAI OFFICE
Project Type: High-Rise Office Building
Scope of Work: Turnkey installation of Daikin Multi, SkyAir concealed ducted, Room Air, and ventilation systems
System Capacity: 40 HP
HUAWEI – IT ROOM
Project Type: High-Rise Office Building
Scope of Work: Turnkey installation of Daikin VRV IV S and SkyAir Inverter air-conditioning systems
System Capacity: 10 HP
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.